Search
Steaming Ahead!
- millsys-3k3
- Apr 8, 2016
- 1 min read
Looking great at the moment...but theres still tons to do.


The cab needs fleshing out as it is still a placeholder 'box', the cranks need to be made, the whole piping system on the left hand side (the side visible here) needs to be made, little details around the hatch at the front of the boiler need to be added. Plus once all that is done, there is a coal tender to be created.
So lots to do.
To Be Continued...